Skip to content
Post-construction cleaning

Post-construction cleaning

From punch list to open doors.

Post-construction cleaning after build-outs, remodels and tenant improvements, timed to your opening or move-in date.

Request a quoteCall (408) 769-3444

Post-construction cleaning from Fieldstone.

A build-out isn’t finished until people can use the space. Post-construction cleaning takes a new or remodeled space from the day the last trade packs up to the morning your team moves in, on the date you planned.

Fieldstone plans the cleanup in passes. A rough clean clears debris once the heavy work ends, a detailed final clean goes top to bottom before move-in, and a touch-up catches anything that settles afterward.

Floors, glass, fixtures and cabinets are left ready for people, on the date you need the space.

Step by step

How it works.

01

See the project

Tell us what ready to open means for your space.

02

Plan the passes

Rough clean, final clean and a last touch-up.

03

Clean top to bottom

Ledges, fixtures, glass, cabinets and floors.

04

Hand over the keys

A space people can move into that day.

Where construction dust hides.

Fine dust from drywall and cutting gets into places nobody wipes in a normal week: the tops of door frames, inside light lenses, across air diffusers, along window tracks, inside new drawers and under sinks, on outlet covers and stair nosings.

It keeps drifting down for days as the air system runs and doors open and close. That’s why the cleanup comes in passes: a rough clean when the heavy work ends, a detailed clean after the last trade and a touch-up right before people move in.

Working to the contractor’s calendar.

The cleanup goes best when it follows the contractor’s schedule. Share when each trade expects to finish, who holds access and which areas are still off limits. If a trade returns after the final clean, the touch-up pass picks up the fresh dust.

Recurring janitorial service can start right after handover, and new vinyl or tile can start a floor program right away. New carpet that saw foot traffic during the build can get extraction before move-in.

What post-construction cleaning costs

Post-construction cleaning is a one-time job priced per square foot, covering every phase from rough clean to final touch-up. Published 2026 figures for the region put it at $0.30 to $0.70 a square foot, with Sacramento-area projects lower and San Francisco build-outs higher. Light refreshes after a small remodel start near $0.22, and heavy new builds with a lot of glass and fine dust reach $1.00. The commercial cleaning cost guide shows how one-time work sits beside recurring rates.

Take an 8,000-square-foot tenant improvement in San Jose: new offices, a break area and fresh flooring throughout. Priced at $0.42 a square foot for all three passes (a rough clean once the heavy work ends, a detailed final after the last trade and a touch-up right before move-in), the job totals $3,360. A one-pass clean of a painted and recarpeted suite comes in well below that rate.

Dust is the main driver: drywall sanding, concrete cutting and ceiling work leave more of it to clear on every pass. Window and glass area, ceiling height, the number of phases and how tightly the schedule is compressed before move-in all move the price. Work done while other trades are still on site takes longer. Removing stickers and paint flecks from new glass and fixtures counts as well. We walk the space with your contractor or project manager and set the passes and dates in a written plan and quote.

A few useful answers

Common questions.

How far ahead of opening day should we call?

As soon as you know the finish date. Planning early lets the cleaning passes line up with the last trades.

Does a tenant improvement count as post-construction work?

Yes. Tenant improvements and remodels are cleaned in the same three passes as a new build.

Can recurring cleaning start right after?

Yes. A nightly or weekly plan can begin the day the space opens.

Do you work alongside the general contractor?

Yes. We share the contractor’s timeline, so each cleaning pass follows the right trade.

Can new floors get their first finish after the cleanup?

Yes. Floor care can follow the final clean, so new vinyl or tile starts life protected.

What if a trade comes back after the final clean?

We schedule a touch-up pass before opening to catch the fresh dust and anything the trade disturbed.

Can our general contractor get your certificate of insurance before you start?

Yes. Every client receives one, so your contractor or property manager can file it before our crew steps on site.

Only one floor of our building was remodeled. Can you clean just that floor?

Yes. When one floor or suite was rebuilt, we clean it and the other floors carry on as usual.

More services

Pairs well with

Industries

Who it’s for.

03 / Building type

Schools

Students and teachers deserve a clean place to start each day.

View details

Tell us about your building. We’ll take it from there.

Get a quoteCall (408) 769-3444